- Center for Biological Diversity v. City of Los Angeles
Center for Biological Diversity v. City of Los Angeles
Geography
Year
2026
Document Type
Litigation
Part of
About this case
Filing year
2026
Status
Verified petition for writ of mandate and complaint for declaratory and injunctive relief filed.
Geography
Docket number
n/a
Court/admin entity
United States → State Courts → California Superior Court (Cal. Super. Ct.)
Case category
State Law Claims (US) → State Impact Assessment Laws (US)
Principal law
United States → California Environmental Quality Act (CEQA)
At issue
Topics
, ,
Documents
Filing Date
Document
Type
Topics
Beta
Search results
08/31/2026
Verified petition for writ of mandate and complaint for declaratory and injunctive relief filed.
Center for Biological Diversity (CBD) filed a California Environmental Quality Act (CEQA) lawsuit against the City of Los Angeles and Los Angeles Department of Water and Power (LADWP), alleging that the environmental impact report (EIR) they prepared in connection with the Scattergood Generating Station Units 1 and 2 Green Hydrogen-Ready Modernization Project was “flawed and unlawful.” CBD alleged that rather than replacing the existing fossil fuel-fired facility with renewable energy capacity after the current facility is required to close in 2029, LADWP instead chose to build a new fossil fuel-fired facility. The petition described the plan for the new facility to be partially fueled by hydrogen as a “chimera” that the EIR did not analyze. Other alleged shortcomings in the EIR included failure to adequately analyze cumulative impacts of related modernization projects at other electric generation facilities; improper dismissal of energy storage and demand management alternatives; and failure to evaluate greenhouse gas emissions from the project.
Petition
–
Summary
Lawsuit challenging the environmental impact report prepared in connection with the Scattergood Generating Station Units 1 and 2 Green Hydrogen-Ready Modernization Project.
Topics mentioned most in this case Beta
See how often topics get mentioned in this case and view specific passages of text highlighted in each document. Accuracy is not 100%. Learn more
Group
Topics
Target
Policy instrument
Risk
Impacted group
Just transition
Renewable energy
Fossil fuel
Greenhouse gas
Economic sector
Adaptation/resilience
Finance