- Climate Litigation Database
- /
- Search
- /
- United States of America
- /
- People of the State of Michigan v. U.S. Department of Energy
People of the State of Michigan v. U.S. Department of Energy
Geography
Year
2025
Document Type
Litigation
Part of
About this case
Filing year
2025
Status
Decided
Geography
Docket number
25-1159
Court/admin entity
United States → United States Court of Appeals for the District of Columbia (D.C. Cir.)United States → United States Federal Courts
Case category
Federal Statutory Claims (US) → Other Statutes and Regulations (US)
Principal law
United States → Federal Power Act
At issue
Challenges to Secretary of Energy’s order determining that an emergency existed in the Midwest due to shortages of electric energy and electric generation facilities and ordering Campbell coal-fired power plant to remain available to operate.
Topics
, ,
Documents
Each case in our database can contain one or more documents.
Filing Date
Document
Type
Topics
Search results
11/03/2026
Brief filed by amici curiae State of West Virginia and 12 other states in support of respondents and in support of rehearing en banc.
Challenges to Secretary of Energy’s order determining that an emergency existed in the Midwest due to shortages of electric energy and electric generation facilities and ordering Campbell coal-fired power plant to remain available to operate.
Amicus Motion/Brief
–
10/26/2026
Petition filed by federal respondents for rehearing en banc or panel rehearing.
The U.S. Department of Energy (DOE) filed a petition for rehearing en banc or panel rehearing of the D.C. Circuit Court of Appeals September 2026 decision holding that DOE exceeded its statutory authority when it unilaterally ordered that the coal-fired J.H. Campbell Generating Plant continue to operate instead of closing under a plan approved by the Michigan Public Service Commission and the Midwest Independent System Operator. DOE’s petition for rehearing argued that the D.C. Circuit’s decision erred by interpreting Section 202(c) to require deference to state actions
Petition For Rehearing
–
09/11/2026
Petitions granted and order vacated.
The D.C. Circuit Court of Appeals held that the U.S. Department of Energy (DOE) exceeded its statutory authority when it unilaterally ordered that the coal-fired J.H. Campbell Generating Plant continue to operate instead of closing under a plan approved by the Michigan Public Service Commission and the Midwest Independent System Operator. The D.C. Circuit concluded that the text, structure, and history of the Federal Power Act did not support DOE’s “sweeping conception” of its emergency authority. The court held that Section 202(c) of the Federal Power Act was “best read to apply where the Department identifies a risk of substantial harm from inadequate electricity supply that calls for immediate action by DOE in particular, as opposed to by the states.” The D.C. Circuit found that the circumstances DOE identified in the challenged order¬—including “the mere possibility of an electricity supply shortfall” without specific details regarding potential severity, timing, location, or likelihood of such a shortfall—did not warrant emergency action under Section 202(c). The D.C. Circuit decision noted that states were “largely responsible for meeting the core policy goal of achieving ‘resource adequacy,’” and noted that in doing so state regulators also have other legal obligations and policy priorities that may include climate change.
Decision
–
03/17/2026
Answering brief filed by respondents.
Challenges to Secretary of Energy’s order determining that an emergency existed in the Midwest due to shortages of electric energy and electric generation facilities and ordering Campbell coal-fired power plant to remain available to operate.
Brief
–
03/17/2026
Brief filed by respondent-intervenor Consumers Energy Company.
Challenges to Secretary of Energy’s order determining that an emergency existed in the Midwest due to shortages of electric energy and electric generation facilities and ordering Campbell coal-fired power plant to remain available to operate.
Brief
–
07/24/2025
Petition for review filed.
Three petitions for review were filed in the D.C. Circuit Court of Appeals challenging the U.S. Secretary of Energy’s May 23, 2025 order pursuant to the Federal Power Act determining that an emergency existed in the Midwest region of the United States due to a shortage of electric energy, shortage of electric energy generation facilities, and other causes, and directing that the Campbell coal-fired power plant in West Olive, Michigan be available to operate for the duration of the order. The plant had been scheduled to cease operations on May 31, 2025. The petitions for review were filed by the People of the State of Michigan, Sierra Club and eight other organizations, and the States of Minnesota and Illinois.
Petition
–
Summary
Challenges to Secretary of Energy’s order determining that an emergency existed in the Midwest due to shortages of electric energy and electric generation facilities and ordering Campbell coal-fired power plant to remain available to operate.
Topics mentioned most in this case
See how often Topics get mentioned in this case and view specific passages of text highlighted in each document.
Group
Topics
Target
Policy instrument
Risk
Just transition
Renewable energy
Fossil fuel
Greenhouse gas
Economic sector
Adaptation/resilience
Finance