- Climate Litigation Database
- /
- Search
- /
- United States
- /
- District of Columbia
- /
- City of Port Isabel v. Federal Energy Regulatory Commission
City of Port Isabel v. Federal Energy Regulatory Commission
Geography
Year
2023
Document Type
Litigation
Part of
About this case
Filing year
2023
Status
Petitions for panel rehearing partially granted to extent of remanding without vacatur.
Geography
Docket number
23-1174
Court/admin entity
United States → United States Federal Courts → D.C. Cir.
Case category
Federal Statutory Claims → NEPAFederal Statutory Claims → Other Statutes and Regulations
Principal law
United States → National Environmental Policy Act (NEPA)United States → Natural Gas Act
At issue
Challenge to FERC order granting new authorizations for LNG terminal in Cameron County, Texas on remand from 2021 D.C. Circuit decision.
Topics
, ,
Documents
Filing Date
Document
Type
Topics
Beta
Search results
03/18/2025
Petitions for panel rehearing partially granted to extent of remanding without vacatur.
The D.C. Circuit Court of Appeals partially granted project applicants’ petitions for panel rehearing of the court’s August 2024 decision vacating the Federal Energy Regulatory Commission’s (FERC’s) reauthorization of two liquefied natural gas (LNG) terminals and an associated pipeline in Texas. The court found that although FERC had made “unjustifiable” procedural choices to skip certain steps, these “procedural missteps, though important, are not so fundamental as to justify throwing the projects and those reliant upon them into disarray.” The court declined to resolve disputes regarding the impacts of two intervening executive orders issued by President Trump that revoked a 1994 executive order on environmental justice and limited the scope of environmental considerations to be weighed by agencies, though the court noted that the orders might be “highly relevant” to FERC’s proceedings on remand.
Decision
–
08/06/2024
Petitions for review granted in part and denied in part, reauthorizations vacated, and cases remanded to FERC for further proceedings.
The D.C. Circuit Court of Appeals vacated the Federal Energy Regulatory Commission’s (FERC’s) reauthorization of two liquefied natural gas (LNG) terminals in Cameron County, Texas, and a pipeline to carry gas to one of the terminals. FERC reauthorized the projects on remand from an <a href="https://climatecasechart.com/case/vecinos-para-el-bienestar-de-la-comunidad-costera-v-federal-energy-regulatory-commission/">earlier D.C. Circuit decision</a> that found that FERC failed to adequately analyze climate change and environmental justice impacts. In considering FERC’s reauthorization, the D.C. Circuit found that FERC erred by declining to prepare a supplemental environmental impact statement to address its “entirely new and significantly expanded environmental justice analysis that reached new conclusions” and by failing to consider a proposed carbon capture and sequestration system for one of the terminals as part of its supplemental environmental review. The D.C. Circuit also found that FERC should have explained why it declined to consider air quality data from an air monitor that was closer to the projects than the monitor from which the project applicant’s analysis drew its data. The D.C. Circuit rejected challenges to FERC’s updated ozone and greenhouse gas analyses. The D.C. Circuit found that FERC had adequately responded to the court’s earlier decision by explaining why a Council on Environmental Quality National Environmental Policy Act (NEPA) regulation did not compel use of the social cost of carbon protocol to assess the significance of greenhouse gas emissions. Because it concluded that FERC had adequately explained why the NEPA regulation did not alter the greenhouse gas analysis, the D.C. Circuit also rejected the petitioners’ related argument that FERC did not explain greenhouse gas emissions’ role in its public interest determinations under the Natural Gas Act. In addition, the court concluded that it lacked jurisdiction to consider arguments that the petitioners did not make before FERC regarding whether other regulations required FERC to somehow evaluate the significance of greenhouse gas emissions.
Decision
–
03/04/2024
Reply brief filed by petitioners.
Reply
–
02/12/2024
Answering brief filed by intervenor-respondent.
Brief
–
02/05/2024
Answering brief filed by FERC.
Brief
–
12/06/2023
Opening brief filed by petitioners.
Brief
–
07/10/2023
Petition for review filed.
The City of Port Isabel, Texas, the Carrizo Comecrudo Tribe of Texas, and Sierra Club filed a petition for review in the D.C. Circuit Court of Appeals challenging a Federal Energy Regulatory Commission (FERC) order on remand from a 2021 D.C. Circuit <a href="https://climatecasechart.com/case/vecinos-para-el-bienestar-de-la-comunidad-costera-v-federal-energy-regulatory-commission/">decision</a> that found that FERC failed to adequately analyze climate change and environmental justice impacts of a liquefied natural gas (LNG) terminal and related pipeline and other facilities on the Brownsville Ship Channel in Cameron County, Texas. FERC addressed these issues, considered modifications to the proposed project, and issued an amended order granting authorizations for the project. Regarding climate change, FERC disclosed “[f]or informational purposes,” FERC staff’s estimate of the social cost of greenhouse gases associated with emissions from construction and operation of the facilities, but FERC said that because there were no accepted tools or methods for determining significance of the emissions, it would not characterize the emissions as significant or insignificant. FERC also conducted a new analysis of environmental justice impacts and found that impacts on environmental justice populations would be disproportionately high and adverse but that only cumulative visual impacts would be significant.
Petition
–
Summary
Challenge to FERC order granting new authorizations for LNG terminal in Cameron County, Texas on remand from 2021 D.C. Circuit decision.
Topics mentioned most in this case Beta
See how often topics get mentioned in this case and view specific passages of text highlighted in each document. Accuracy is not 100%. Learn more
Group
Topics
Policy instrument
Risk
Impacted group
Just transition
Renewable energy
Fossil fuel
Greenhouse gas
Economic sector
Adaptation/resilience