Skip to content
The Climate Litigation Database

Lark Energy Ltd. v. Secretary for State for Communities and Local Government

Geography
🇬🇧 United Kingdom
Year
2014
Document Type
Litigation

About this case

Filing year
2014
Status
Decided
Geography
🇬🇧 United Kingdom
Court/admin entity
United Kingdom → England and Wales → High Court of Justice
Case category
Suits against governments (Global) → Environmental assessment and permitting (Global) → Renewable projects (Global)
Principal law
United Kingdom → Town and Country Planning Act 1990 (England and Wales)
Topics
, ,  

Documents

Each case in our database can contain one or more documents.

Filing Date
Document
Type
Topics
03/11/2015
Other
Energy supply mitigationRenewable energyEnergy supply sectorConstruction sector+ 18 more
06/20/2014
In 2013, Lark Energy Ltd applied for planning permission to install a 24MW solar farm on a site of approximately 46 hectares at Ellough Airfield. Waveney District Council (the Council) refused the application – the Council had previously granted permission for a smaller 14.1MW solar farm on the northern part of the same site. The Secretary of State for Communities and Local Government recovered the appeal and, on 16 October 2013, rejected his inspector’s recommendation to allow it, concluding that the benefits of additional renewable energy did not outweigh the harm to the character and appearance of the area.The grounds under challenge were as follows: Issue One: Whether the Secretary of State erred in law in the way he dealt with the permitted scheme, which he regarded as a fallback position and therefore failed to consider the proposal on its own merits? Issue Two: Whether the Secretary of State failed to fulfil his duty under section 38(6) of the Planning and Compulsory Purchase Act 2004 to make his decision in accordance with the development plan unless material considerations indicated otherwise? Issue Three: Whether the Secretary of State failed to consider the appeal scheme in accordance with paragraph 14 of the National Planning Policy Framework? Issue Four: Whether the Secretary of State exaggerated the limited harm the development would cause to the character and appearance of the area, by giving weight to local objections and therefore failed to apply the Government’s planning practice guidance for renewable and low carbon energy? The High Court of Justice quashed the Secretary of State’s decision, remitting the case to him for redetermination. It found that: Issue One: The Secretary of State did consider the proposal on its own planning merits, and not merely by comparing it with the permitted scheme. His ‘Overall Conclusions’ in the decision letter related to the merits of the appeal scheme itself, including but not limited to its advantages and disadvantages when compared with the smaller proposal. This ground therefore failed. Issue Two: The Secretary of State failed to fulfil his duty under section 38(6). The decision letter contained an assessment in which the proposal complied in substance with Policy DM03 but conflicted with Policy DM27. The Secretary of State never explained how he reconciled his conclusions relating to those two policies, nor did he state whether the proposal was in accordance with the development plan read as a whole. This was a fatal flaw, causing substantial prejudice. This ground therefore succeeded. Issue Three: It was not Lark Energy’s case that the development plan was absent, silent or out of date. The Secretary of State clearly had in mind the relevant national planning policy. This ground failed. Issue Four: The Secretary of State properly followed the Government’s planning practice guidance. He was entitled to give weight to the concerns of local residents about landscape impact, and this did not amount to double-counting or taking into account an immaterial consideration. This ground failed.
Decision
Energy supply mitigationRenewable energyEnergy supply sectorMarginalized ethnicity+ 10 more
10/16/2013
Decision of the Secretary of State for Communities and Local Government to dismiss Lark Energy Ltd.'s appeal.
Decision
Energy supply mitigationRenewable energyEnergy supply sectorConstruction sector+ 20 more

Summary

In 2013, Lark Energy Ltd applied for planning permission to install a 24MW solar farm on a site of approximately 46 hectares at Ellough Airfield. Waveney District Council (the Council) refused the application – the Council had previously granted permission for a smaller 14.1MW solar farm on the northern part of the same site. The Secretary of State for Communities and Local Government recovered the appeal and, on 16 October 2013, rejected his inspector’s recommendation to allow it, concluding that the benefits of additional renewable energy did not outweigh the harm to the character and appearance of the area.The grounds under challenge were as follows:
Issue One: Whether the Secretary of State erred in law in the way he dealt with the permitted scheme, which he regarded as a fallback position and therefore failed to consider the proposal on its own merits?
Issue Two: Whether the Secretary of State failed to fulfil his duty under section 38(6) of the Planning and Compulsory Purchase Act 2004 to make his decision in accordance with the development plan unless material considerations indicated otherwise?
Issue Three: Whether the Secretary of State failed to consider the appeal scheme in accordance with paragraph 14 of the National Planning Policy Framework?
Issue Four: Whether the Secretary of State exaggerated the limited harm the development would cause to the character and appearance of the area, by giving weight to local objections and therefore failed to apply the Government’s planning practice guidance for renewable and low carbon energy?
The High Court of Justice quashed the Secretary of State’s decision, remitting the case to him for redetermination. It found that:
Issue One: The Secretary of State did consider the proposal on its own planning merits, and not merely by comparing it with the permitted scheme. His ‘Overall Conclusions’ in the decision letter related to the merits of the appeal scheme itself, including but not limited to its advantages and disadvantages when compared with the smaller proposal. This ground therefore failed.
Issue Two: The Secretary of State failed to fulfil his duty under section 38(6). The decision letter contained an assessment in which the proposal complied in substance with Policy DM03 but conflicted with Policy DM27. The Secretary of State never explained how he reconciled his conclusions relating to those two policies, nor did he state whether the proposal was in accordance with the development plan read as a whole. This was a fatal flaw, causing substantial prejudice. This ground therefore succeeded.
Issue Three: It was not Lark Energy’s case that the development plan was absent, silent or out of date. The Secretary of State clearly had in mind the relevant national planning policy. This ground failed.
Issue Four: The Secretary of State properly followed the Government’s planning practice guidance. He was entitled to give weight to the concerns of local residents about landscape impact, and this did not amount to double-counting or taking into account an immaterial consideration. This ground failed.

 Topics mentioned most in this case

See how often Topics get mentioned in this case and view specific passages of text highlighted in each document.

Group
Topics
Target
Policy instrument
Risk
Impacted group
Just transition
Renewable energy
Greenhouse gas
Economic sector
Finance