- Climate Litigation Database
- /
- Search
- /
- United States of America
- /
- Berka v. U.S. Nuclear Regulatory Commission
Berka v. U.S. Nuclear Regulatory Commission
Geography
Year
2021
Document Type
Litigation
Part of
About this case
Filing year
2021
Status
Petition for review dismissed.
Geography
Docket number
21-1134
Court/admin entity
United States → United States Federal Courts → United States Court of Appeals for the District of Columbia (D.C. Cir.)
Case category
Federal Statutory Claims (US) → Other Statutes and Regulations (US)
Principal law
United States → Energy Reorganization Act
At issue
Challenge to the Nuclear Regulatory Commission’s denial of a petition “that would permit shuttered nuclear power reactors to re-start and be returned to service, essentially ‘as they were,’ without the need for excessively costly upgrades.”
Topics
, ,
Documents
Each case in our database can contain one or more documents.
Filing Date
Document
Type
Topics
02/03/2022
Petition for review dismissed.
In an unpublished judgment, the D.C. Circuit Court of Appeals dismissed a pro se petitioner’s challenge of the Nuclear Regulatory Commission’s denial of his petition “that would permit shuttered nuclear power reactors to re-start and be returned to service, essentially ‘as they were,’ without the need for excessively costly upgrades.” The petitioner believed that “returning shuttered nuclear power reactors to service represents the most economical and cost-effective means to deal with the pressing, imminent, and existential threat of climate change, and to return our vulnerable, electrical grid to the robust status that it once had.” The D.C. Circuit concluded that the petitioner had not shown he had standing because his asserted injury based on climate change was “not a particularized injury” and because any alleged particularized injury based on possible power outages during cold weather was not actual or imminent. The D.C. Circuit also found that the petitioner did not establish the redressability prong of standing.
Decision
Energy supply mitigationPublic sectorTechnological impact
11/12/2021
Reply brief filed by plaintiff.
Reply
Energy supply mitigationFossil fuelGasExtreme weather+ 14 more
10/21/2021
Brief filed by federal respondents.
Brief
Public sectorEnergy supply mitigationConstruction sectorBan+ 12 more
09/09/2021
Brief filed by plaintiff.
Brief
Energy supply mitigationRenewable energyFossil fuelEnergy supply sector+ 15 more
06/03/2021
Petition for review filed.
Petition
Energy supply mitigationRenewable energyFinance flowExtreme weather+ 10 more
Summary
Challenge to the Nuclear Regulatory Commission’s denial of a petition “that would permit shuttered nuclear power reactors to re-start and be returned to service, essentially ‘as they were,’ without the need for excessively costly upgrades.”
Topics mentioned most in this case
See how often Topics get mentioned in this case and view specific passages of text highlighted in each document.
Group
Topics
Policy instrument
Risk
Impacted group
Just transition
Renewable energy
Fossil fuel
Greenhouse gas
Economic sector
Finance