Dual Gas Pty. Ltd. and Others v. Environment Protection Authority

Geography
🇦🇺 Australia → Victoria
Year
2012
Document Type
Litigation

About this case

Filing year
2012
Status
Approved with conditions
Geography
🇦🇺 Australia → Victoria
Court/admin entity
Australia → Victoria → Civil and Administrative Tribunal
Case category
Suits against governments (Global) → Environmental assessment and permitting (Global) → Other projects (Global)
Principal law
–
Topics
, ,  

Documents

Each case in our database can contain one or more documents.

Filing Date
Document
Type
Topics
03/29/2012
The EPA issued a works approval to Dual Gas for a 300 MWe power station for the development of a project involving new power generation technology from coal and natural gas. Four objectors challenged the approval in an Australia state court, including Environment Victoria, which asserted that the project would be inconsistent with Victoria’s State Environment Protection Policy (SEPP). Dual Gas challenged the objectors standing, sought review of conditions on the works approval requiring a specific level of operation efficiency, SO2 capture, and noise attenuation, and sought to reinstate the originally proposed generating capacity of 600 MWe. The court found that three of the four objectors had standing because they had interests that would be affected by the project. However, the court rejected their challenges finding that the project was consistent with ‘best practices’ requirements and the general goals of the SEPP. The court granted Dual Gas’s application and raised the capacity to 600 Mwe, but refused to remove the conditions.
Decision
Fossil fuelGasGreenhouse gasCoal+ 39 more

Summary

The EPA issued a works approval to Dual Gas for a 300 MWe power station for the development of a project involving new power generation technology from coal and natural gas. Four objectors challenged the approval in an Australia state court, including Environment Victoria, which asserted that the project would be inconsistent with Victoria’s State Environment Protection Policy (SEPP). Dual Gas challenged the objectors standing, sought review of conditions on the works approval requiring a specific level of operation efficiency, SO2 capture, and noise attenuation, and sought to reinstate the originally proposed generating capacity of 600 MWe. The court found that three of the four objectors had standing because they had interests that would be affected by the project. However, the court rejected their challenges finding that the project was consistent with ‘best practices’ requirements and the general goals of the SEPP. The court granted Dual Gas’s application and raised the capacity to 600 Mwe, but refused to remove the conditions.

 Topics mentioned most in this case

See how often Topics get mentioned in this case and view specific passages of text highlighted in each document.

Group
Topics
Target
Policy instrument
Risk
Impacted group
Renewable energy
Fossil fuel
Greenhouse gas
Economic sector
Adaptation/resilience
Finance