GreenRoots, Inc. v. Energy Facilities Siting Board
Geography
Year
2021
Document Type
Litigation
Part of
About this case
Filing year
2021
Status
Decision of the board affirmed.
Geography
Docket number
SJC-13233
Court/admin entity
United States → State Courts → Massachusetts Supreme Judicial Court (Mass.)
Case category
Adaptation (US) → Actions seeking adaptation measures (US)State Law Claims (US) → Utility Regulation (US)
Principal law
United States → Massachusetts Utility Laws
At issue
Challenge to the approval of a petition to move a proposed electric substation's boundaries from a previously approved location.
Topics
, ,
Documents
Filing Date
Document
Type
Topics
Beta
11/04/2022
Decision of the board affirmed.
The Massachusetts Supreme Judicial Court upheld the Energy Facilities Siting Board’s approval of a petition to move a proposed electric substation’s boundaries 190 feet from a previously approved location. The party challenging the approval argued, among other things, that the new location put the substation at risk from sea level rise due to climate change and that the Board should have used a planning horizon based on the 60-year average age of substations currently in use. The court, however, found no error in the Board’s adoption of a 40-year planning horizon based on the design life of the substation. The court said the planning horizon was reasonable, “given the uncertainties in long-term predictions of sea level rise and electricity demand.” The court further concluded that the 40-year planning approach, combined with ongoing reporting requirements, was “a reasonable approach to handling the uncertainty of climate change.” The court noted that “[o]ther courts have approved similar schemes with regard to sea level rise,” citing a 2015 federal court <a href="https://climatecasechart.com/wp-content/uploads/case-documents/2015/20150831_docket-12-cv-0041_opinion.pdf">decision</a> that found that consideration of short-term climate impacts over the 10-year term of certain fisheries was appropriate and approved the agency determination that long-term effects were “too indeterminate to yield clearly articulable conclusions.”
Decision
Summary
Challenge to the approval of a petition to move a proposed electric substation's boundaries from a previously approved location.
Topics mentioned most in this case Beta
See how often topics get mentioned in this case and view specific passages of text highlighted in each document. Accuracy is not 100%. Learn more
Group
Topics
Risk
Impacted group
Just transition
Economic sector
Adaptation/resilience
Finance