- Climate Litigation Database
- /
- Search
- /
- United States
- /
- Minnesota
- /
- In re Enbridge Energy, LP
About this case
Documents
Filing Date
Type
Action Taken
Document
Summary
06/03/2019
Decision
Commission's adequacy decision reversed and remanded.
The Minnesota Court of Appeals reversed the Public Utilities Commission’s determination that the final environmental impact statement (FEIS) for the proposed Enbridge Line 3 oil pipeline project was adequate. Although the court upheld the Commission’s conclusion that the consideration of many issues, including upstream greenhouse gas emissions, was adequate, the court found that the FEIS was inadequate because it did not address the potential impact of an oil spill into the Lake Superior watershed.
Summary
Application for replacement oil pipeline in Minnesota.