Skip to content
The Climate Litigation Database

Lock the Gate Alliance Ltd v Tamboran B2 Pty Ltd

Geography
🇦🇺 Australia
Year
2024
Document Type
Litigation

About this case

Filing year
2024
Status
Decided
Geography
🇦🇺 Australia
Court/admin entity
Australia → Federal Court of Australia
Case category
Suits against corporations, individuals (Global) → Corporations (Global)Suits against corporations, individuals (Global) → Enforcement of Environmental and Climate Laws (Global)
Principal law
Australia → Environment Protection and Biodiversity Conservation Act 1999 (Cth)
Topics
, ,  

Documents

Each case in our database can contain one or more documents.

Filing Date
Document
Type
Topics
06/26/2026
Decision
Fossil fuelGasConstruction sectorExtractive sector+ 24 more

Summary

On December 6, 2024, Environmental Justice Australia brought a challenge against a fracking project in the Northern Territory’s Beetaloo sub-basin. According to the Applicant, although Tamboran B2 Pty Ltd (“Tamboran”) obtained the permission under Northern Territory law for the project, Tamboran was to also seek approval from the Commonwealth Government. As part of the Shenandoah South Pilot fracking project, Tamboran proposed drilling and fracking 15 wells in the basin near the culturally and ecologically significant Lake Woods and Elliot region.

The Applicant relied on the newly-amended “water trigger” provision of the Environment Protection and Biodiversity Conservation Act 1999 (Cth) (EPBC Act) (namely, ss 24D and 24E), Australia’s primary federal environmental protection and assessment legislation. The water trigger provision requires referral of an unconventional gas project for environmental assessment if it is likely to significantly impact a water resource. The applicants argued that the project was required to be referred because it would involve drilling through critically important underground water sources which support local ecosystems and are used for drinking water and livestock. Tamboran argued that the federal water trigger provisions did not apply. The applicants sought an injunction to prevent the Project going ahead unless assessed and approved under the EPBC Act. Expert witnesses were called by both parties to give evidence on whether the Project was likely to have a significant impact on protected groundwater, including due to the risk of well integrity failure.

On June 26, 2026, J. Owens of the Federal Court of Australia dismissed the case, concluding that the evidence did not demonstrate that it was “likely” in the requisite sense that the Project’s wells would suffer an integrity failure of a kind that would lead to the contamination of the groundwater. His Honour further found that, even if a well integrity failure was “likely,” His Honour would not have held that it was “likely” that there would be a significant impact on the water resource as a result.

 Topics mentioned most in this case

See how often Topics get mentioned in this case and view specific passages of text highlighted in each document.

Group
Topics
Policy instrument
Risk
Impacted group
Just transition
Fossil fuel
Greenhouse gas
Economic sector
Adaptation/resilience
Finance