Skip to content
The Climate Litigation Database

Newton and Anor v. Great Lakes Council

Geography
πŸ‡¦πŸ‡ΊΒ Australia β†’ New South Wales
Year
2013
Document Type
Litigation

About this case

Filing year
2013
Status
Successful with restpect to time limits but not structural requirements
Geography
πŸ‡¦πŸ‡ΊΒ Australia β†’ New South Wales
Court/admin entity
Australia β†’ New South Wales β†’ Land and Environment Court
Case category
Suits against governments (Global) β†’ Environmental assessment and permitting (Global) β†’ Climate adaptation (Global)
Principal law
Australia β†’ Great Lakes Local Environmental Plan 1996 (NSW)

Documents

Each case in our database can contain one or more documents.

Filing Date
Document
Type
–
–

Summary

A landowner challenged a local council decision to grant a planning permit to build a house on two conditions: (1) the development consent would only last for twenty years, and (2) the house must be designed to withstand 2033 sea level rise conditions. The Australian state court found in part for the landowner, rejecting the first condition but allowing the second. The court found the time limit imposed under the first condition was unreasonable, especially given the presence of the second condition.