In April 2026, the Public Prosecutor's Office of the State of Rio de Janeiro (MPRJ) filed a Public Civil Action (ACP), with a request for urgent relief against the Municipality of Rio de Janeiro to regulate the assessment of climate impacts and require climate diagnostic studies in environmental licensing processes, and to demand mitigation and compensation measures in projects that cause significant greenhouse gas (GHG) emissions in the city. The plaintiff argues that recurring extreme weather events place the fight against climate change at the center of the state's duties of environmental protection and that the Municipality of Rio de Janeiro, in Article 25 of Municipal Law 5.248/2011—which establishes the Municipal Policy on Climate Change and Sustainable Development—stipulates that environmental licenses for projects with significant GHG emissions will be linked to the presentation of an emissions mitigation plan and compensation measures. It is argued that despite this provision, the application of this rule is nonexistent, constituting an administrative omission, which hinders the proper assessment of impacts and the effectiveness of the municipal climate policy.
The complaint alleges that, in September 2024, the Public Prosecutor's Office of Rio de Janeiro (MPRJ) issued Recommendation No. 02/2024 to the city's mayor, requesting, among other measures, the enactment of a regulatory act implementing Article 25 of Municipal Law 5.248/2011 within 90 days. In March 2025, a Technical Opinion from the Municipal Attorney General's Office concluded that the aforementioned article should be regulated by law and not by decree. It is argued that this opinion suggested the creation of a Working Group to discuss the issue, with the consequent formulation of a legislative proposal to be submitted to the City Council; however, up to the date of writing the initial petition, the MPRJ was unaware of the creation of the group.
It is noteworthy that the city of Rio de Janeiro ranks 8th among the largest greenhouse gas (GHG) emitting municipalities in Brazil, with significant emissions from the waste, energy, and industrial processes sectors, all of which are subject to environmental licensing. It is also important to highlight that, between 2023 and 2025, there were significant local impacts of climate change from events such as intense rainfall, flash floods, and inundations, demonstrating that climate stability is inseparable from the protection of life and the well-being of the population. It is no coincidence that the city of Rio de Janeiro, through Municipal Law 7.315/2022, recognized the state of global climate emergency as a factor threatening humanity.
Additionally, the complaint argues that international jurisprudence recognizes a stable climate as a fundamental human right, and Advisory Opinion 32/2025 (PC-32/2025) of the Inter-American Court of Human Rights (IACHR) recognized global warming as a violation of human rights. Finally, it argues that the requirement for emissions diagnostics/reporting must meet minimum technical criteria to ensure that the potential climate impacts of a given project are truly known and addressed in environmental licensing processes. As such, it requests that Article 25 be regulated as an urgent measure within a period not exceeding 120 days. This would make the granting and renewal of environmental licenses for projects with significant GHG emissions contingent on the presentation of an emissions mitigation plan and compensation measures, duly preceded by climate studies that ensure the identification and measurement of the impacts of activities and projects, the analysis of locational and technological alternatives, and the adoption of mitigation and compensation measures in all phases of the licensing process. It is further requested that, should the 120-day period pass without regulation, the Municipality begin requiring projects with significant GHG emissions to present an emissions mitigation plan and compensation measures duly preceded by climate studies in the licensing or renewal process. On the merits, confirmation of the requests made in the preliminary injunction is requested, making them definitive.
In August 2026, a decision was issued partially granting the preliminary injunction. It recognized that the action aims to implement measures for the adequate consideration of climate impacts in environmental licensing processes, in accordance with the municipal obligation to protect an ecologically balanced environment, as per Article 225 of the Federal Constitution. The Court dismissed the preliminary objection of inadequacy of the chosen legal remedy, emphasizing that judicial review of administrative omissions is possible. The decision considered, however, that the controversy regarding the need for a formal law versus a simple regulation requires further evidentiary investigation, which is why it did not grant the request to impose a specific deadline for the issuance of a specific normative act. The court recognized the likelihood of the right (evidenced by the disregard for climate impacts in environmental licensing processes and the recognition by the Rio de Janeiro Municipal Government of a global climate emergency) and the risk of irreparable harm (based on data of deaths and displacements due to extreme weather events in the city), ordering the Municipality, within 90 days and until definitive regulations are in place, to require that projects with significant GHG emissions submit a mitigation and compensation plan preceded by climate studies during environmental licensing processes, under penalty of a daily fine of R$ 100,000.00 (limited to 30 days). It further ordered the submission of a detailed report within 120 days and the referral of the case to the 4th Justice 4.0 Center – Environmental Law, with the analysis of the reversal of the burden of proof reserved for this specialized court.
- Climate Litigation Database
- /
- Search
- /
- Brazil
- /
- Rio de Janeiro Public Prosecutor’s Office vs. Rio de Janeiro Municipality
Rio de Janeiro Public Prosecutor’s Office vs. Rio de Janeiro Municipality
About this case
Filing year
2026
Status
Pending
Geography
🇧🇷 Brazil
Court/admin entity
–
Case category
Suits against governments (Global) → Environmental assessment and permitting (Global)
Principal law
Brazil → Federal Constitution of 1988 → Article 170 of the Federal Constitution (CRFB/88) → Article 225 of the Federal Constitution (CRFB/88)Brazil → Framework Law on Environmental Licensing – LGLA (Federal Law 15.190/2025)Brazil → IBAMA's Normative Instruction 12/2010Brazil → Municipal Policy on Climate ChangeBrazil → National Climate Change Policy (Law No. 12187 of 2009)Brazil → National Policy on Climate Change – PNMC (Federal Law No. 12.187 of 2009)Brazil → Paris Agreement (enacted by Federal Decree No. 9.073 of 2017)Brazil → State Policy on Climate Change – PEMC (State Law No. 16.497 of 2009)Brazil → UN Framework Convention on Climate Change - UNFCCC (enacted by Federal Decree 2652/1998)
Topics
, ,
Documents
Each case in our database can contain one or more documents.
Filing Date
Document
Type
Topics
08/19/2026
Preliminary injunction partially granted (in Portuguese).
Decision
Greenhouse gasExtreme weatherAdaptation/resilienceBan+ 3 more
04/01/2026
In April 2026, the Public Prosecutor's Office of the State of Rio de Janeiro (MPRJ) filed a Public Civil Action (ACP), with a request for urgent relief against the Municipality of Rio de Janeiro to regulate the assessment of climate impacts and require climate diagnostic studies in environmental licensing processes, and to demand mitigation and compensation measures in projects that cause significant greenhouse gas (GHG) emissions in the city. The plaintiff argues that recurring extreme weather events place the fight against climate change at the center of the state's duties of environmental protection and that the Municipality of Rio de Janeiro, in Article 25 of Municipal Law 5.248/2011—which establishes the Municipal Policy on Climate Change and Sustainable Development—stipulates that environmental licenses for projects with significant GHG emissions will be linked to the presentation of an emissions mitigation plan and compensation measures. It is argued that despite this provision, the application of this rule is nonexistent, constituting an administrative omission, which hinders the proper assessment of impacts and the effectiveness of the municipal climate policy.
The complaint alleges that, in September 2024, the Public Prosecutor's Office of Rio de Janeiro (MPRJ) issued Recommendation No. 02/2024 to the city's mayor, requesting, among other measures, the enactment of a regulatory act implementing Article 25 of Municipal Law 5.248/2011 within 90 days. In March 2025, a Technical Opinion from the Municipal Attorney General's Office concluded that the aforementioned article should be regulated by law and not by decree. It is argued that this opinion suggested the creation of a Working Group to discuss the issue, with the consequent formulation of a legislative proposal to be submitted to the City Council; however, up to the date of writing the initial petition, the MPRJ was unaware of the creation of the group.
It is noteworthy that the city of Rio de Janeiro ranks 8th among the largest greenhouse gas (GHG) emitting municipalities in Brazil, with significant emissions from the waste, energy, and industrial processes sectors, all of which are subject to environmental licensing. It is also important to highlight that, between 2023 and 2025, there were significant local impacts of climate change from events such as intense rainfall, flash floods, and inundations, demonstrating that climate stability is inseparable from the protection of life and the well-being of the population. It is no coincidence that the city of Rio de Janeiro, through Municipal Law 7.315/2022, recognized the state of global climate emergency as a factor threatening humanity.
Additionally, the complaint argues that international jurisprudence recognizes a stable climate as a fundamental human right, and Advisory Opinion 32/2025 (PC-32/2025) of the Inter-American Court of Human Rights (IACHR) recognized global warming as a violation of human rights. Finally, it argues that the requirement for emissions diagnostics/reporting must meet minimum technical criteria to ensure that the potential climate impacts of a given project are truly known and addressed in environmental licensing processes. As such, it requests that Article 25 be regulated as an urgent measure within a period not exceeding 120 days. This would make the granting and renewal of environmental licenses for projects with significant GHG emissions contingent on the presentation of an emissions mitigation plan and compensation measures, duly preceded by climate studies that ensure the identification and measurement of the impacts of activities and projects, the analysis of locational and technological alternatives, and the adoption of mitigation and compensation measures in all phases of the licensing process. It is further requested that, should the 120-day period pass without regulation, the Municipality begin requiring projects with significant GHG emissions to present an emissions mitigation plan and compensation measures duly preceded by climate studies in the licensing or renewal process. On the merits, confirmation of the requests made in the preliminary injunction is requested, making them definitive.
In August 2026, a decision was issued partially granting the preliminary injunction. It recognized that the action aims to implement measures for the adequate consideration of climate impacts in environmental licensing processes, in accordance with the municipal obligation to protect an ecologically balanced environment, as per Article 225 of the Federal Constitution. The Court dismissed the preliminary objection of inadequacy of the chosen legal remedy, emphasizing that judicial review of administrative omissions is possible. The decision considered, however, that the controversy regarding the need for a formal law versus a simple regulation requires further evidentiary investigation, which is why it did not grant the request to impose a specific deadline for the issuance of a specific normative act. The court recognized the likelihood of the right (evidenced by the disregard for climate impacts in environmental licensing processes and the recognition by the Rio de Janeiro Municipal Government of a global climate emergency) and the risk of irreparable harm (based on data of deaths and displacements due to extreme weather events in the city), ordering the Municipality, within 90 days and until definitive regulations are in place, to require that projects with significant GHG emissions submit a mitigation and compensation plan preceded by climate studies during environmental licensing processes, under penalty of a daily fine of R$ 100,000.00 (limited to 30 days). It further ordered the submission of a detailed report within 120 days and the referral of the case to the 4th Justice 4.0 Center – Environmental Law, with the analysis of the reversal of the burden of proof reserved for this specialized court.
Complaint
Greenhouse gasAdaptation/resilienceExtreme weatherSlow onset event+ 47 more
Summary
Topics mentioned most in this case
See how often Topics get mentioned in this case and view specific passages of text highlighted in each document.
Group
Topics
Target
Policy instrument
Risk
Impacted group
Just transition
Renewable energy
Fossil fuel
Greenhouse gas
Economic sector
Adaptation/resilience
Finance