Filing year
2026
Status
Petition for writ of mandate and complaint for declaratory and injunctive relief filed.
Geography
Docket number
n/a
Court/admin entity
United States → State Courts → California Superior Court (Cal. Super. Ct.)
Case category
State Law Claims (US) → State Impact Assessment Laws (US)
Principal law
United States → California Environmental Quality Act (CEQA)
At issue
Challenge to the City Council for the City of Barstow’s approval of the Burlington Northern Santa Fe (BNSF) Barstow International Gateway railyard, which allegedly would be the largest rail facility in the country.
Topics
, ,
Documents
Filing Date
Document
Type
Topics
Beta
06/30/2026
Petition for writ of mandate and complaint for declaratory and injunctive relief filed.
Four environmental organizations filed a lawsuit in California Superior Court challenging the City Council for the City of Barstow’s approval of the Burlington Northern Santa Fe (BNSF) Barstow International Gateway railyard (BIG Project). Their petition alleged that the BIG Project would be largest rail facility in the country, comprising “a 5,000-acre rail and logistics facility that includes 9 million square feet of transload warehousing, an ancillary rail storage area, a block swap yard, and an intermodal facility.” The organizations alleged that the City’s environmental review under the California Environmental Quality Act (CEQA) failed to adequately disclose, analyze, and mitigate environmental impacts, including impacts on greenhouse gas emissions. Regarding greenhouse gas emissions, the organizations alleged that the environmental impact report (EIR) relied on a “fundamentally flawed” analysis of “Truck Miles Traveled” and did not address greenhouse gas emissions impacts resulting directly or indirectly from the increase in processing capacity at BNSF’s other railyards in the region or from new and changed heavy-duty truck traffic across California. The organizations contended that the EIR’s sole greenhouse gas mitigation measure was inadequate. The petition described the mitigation measure as providing that the City prepare a Climate Action Plan to align emissions targets with State law targets while conceding that the City would not achieve the reduction targets. The organizations alleged that the EIR failed to consider all feasible mitigation measures to address greenhouse gas impacts, including zero-emission line-haul locomotives, switcher locomotives, trucks, rubber-tired gantry cranes, and transport refrigeration units. The petition also alleged that the final EIR deleted a battery energy storage system from the project description, which deprived the public of an opportunity to comment on feasible ways to avoid or minimize resulting impacts such as greenhouse gas emissions. In addition, the petition alleged that the final EIR did not provide an explanation for changing the conclusions regarding the significance of greenhouse gas emissions impacts from “Less than Significant” in the draft EIR to “Potentially Significant” in the final EIR.
Petition
Summary
Challenge to the City Council for the City of Barstow’s approval of the Burlington Northern Santa Fe (BNSF) Barstow International Gateway railyard, which allegedly would be the largest rail facility in the country.
Topics mentioned most in this case Beta
See how often topics get mentioned in this case and view specific passages of text highlighted in each document. Accuracy is not 100%. Learn more
Group
Topics
Target
Policy instrument
Risk
Impacted group
Just transition
Renewable energy
Fossil fuel
Greenhouse gas
Economic sector
Adaptation/resilience
Finance