About this case
Filing year
2020
Status
Energy Facilities Siting Board order affirmed.
Geography
Docket number
SJC-12997
Court/admin entity
United States → State Courts → Massachusetts Supreme Judicial Court (Mass.)
Case category
State Law Claims (US) → Utility Regulation (US)
Principal law
United States → Massachusetts Act to Promote Energy DiversityUnited States → Massachusetts Global Warming Solutions ActUnited States → State Law—Miscellaneous Statutes → Massachusetts Electric Utility Restructuring Act → Massachusetts Utility Laws
At issue
Challenge to the approval of a new underground electrical transmission line running between substations in Massachusetts.
Topics
, ,
Documents
Each case in our database can contain one or more documents.
Filing Date
Document
Type
Topics
06/25/2021
Energy Facilities Siting Board order affirmed.
The Massachusetts Supreme Judicial Court affirmed the Energy Facilities Siting Board’s approval of a proposal for a new underground electrical transmission line running between substations in the Towns of Sudbury and Hudson. The court noted that the Board was required to balance three objectives—reliability, environmental impact, and cost—by maximizing reliability and minimizing environmental impact and cost; that a proposal was not required to “be the best in each of the three categories”; and that the factors were to be “considered in combination with each other,” with no single factor prioritized over another. In this case, the court found no basis for disturbing the Board’s determinations, given the Board’s “careful and reasoned decision.” Citing the importance of a reliable electrical system, the court rejected arguments by the Town of Sudbury that the Board’s determination regarding the need for additional energy resources was too conservative. The court also rejected the Town’s argument that the project was not consistent with current health, environmental protection, and resource use and development policies in Massachusetts. The court noted that the Board had determined that the project was consistent with the Commonwealth’s environmental protection policies, including the Global Warming Solutions Act of 2008, because the project would generate minimal greenhouse gases and have no adverse climate change impacts and would facilitate integration of renewable energy resources by increasing the transmission system’s reliability. Although the Town argued that a non-transmission alternative solution would have been more consistent with more recent policies, including climate and environmental policies, the court found that the Town did not provide a basis for reversing the Board’s assessment.
Decision
Energy supply sectorConstruction sectorEnergy supply mitigationRenewable energy+ 9 more
Summary
Challenge to the approval of a new underground electrical transmission line running between substations in Massachusetts.
Topics mentioned most in this case
See how often Topics get mentioned in this case and view specific passages of text highlighted in each document.
Group
Topics
Policy instrument
Risk
Renewable energy
Greenhouse gas
Economic sector
Finance