Skip to content
The Climate Litigation Database

Columbia Riverkeeper v. U.S. Army Corps of Engineers

Geography
Year
2019
Document Type
Litigation
Part of

About this case

Filing year
2019
Status
Plaintiffs' motion for summary judgment granted in part and denied in part and permits vacated.
Geography
Docket number
3:19-cv-06071
Court/admin entity
United States → United States Federal Courts → United States District Court for the Western District of Washington (W.D. Wash.)
Case category
Federal Statutory Claims (US) → Clean Water Act (US)Federal Statutory Claims (US) → NEPA (US)
Principal law
United States → Administrative Procedure Act (APA)United States → Clean Water Act (CWA)United States → Endangered Species Act (ESA)United States → National Environmental Policy Act (NEPA)
At issue
Challenge to U.S. Corps of Engineers issuance of a Section 404 permit for a maritime export terminal associated with a proposed methanol facility in Washington on the Columbia River.
Topics
, ,  

Documents

Each case in our database can contain one or more documents.

Filing Date
Document
Type
Topics
11/23/2020
Plaintiffs' motion for summary judgment granted in part and denied in part and permits vacated.
The federal district court for the Western District of Washington vacated U.S. Army Corps of Engineer permits for construction of a portion of a proposed methanol refinery and export terminal in Washington (the Kalama Project). The court found that the Corps’ failure to consider “reasonable foreseeable” greenhouse gas emissions outside Washington and part of Oregon was arbitrary and capricious because the Corps should have considered indirect cumulative effects such as increased fracking and related emissions as well as emissions from shipping methanol and producing olefins (using methanol) in other parts of the world. The court also held that the Corps violated the National Environmental Policy Act (NEPA) by not considering the need to expand the regional gas pipeline system as a cumulative indirect effect of the project. The further found that the failure to prepare an environmental impact statement violated NEPA. In addition, the court found that the Corps did not correctly conduct a public interest assessment under the Clean Water Act and Rivers and Harbors Act because it failed to properly consider the project’s full cumulative impacts and “arbitrarily and capriciously relied on benefits of the Project in worldwide reduction of greenhouse gases [due to reduced use of coal to produce methanol] without conducting an assessment of the detriments worldwide.” The court denied a claim under the Endangered Species Act.
Decision
Chemical impactFossil fuelGasGreenhouse gas+ 18 more
11/12/2019
Complaint filed.
Five organizations filed a lawsuit in federal court in Washington challenging the U.S. Army Corps of Engineers’ issuance of a Section 404 permit for a marine export terminal on the Columbia River in Kalama, Washington. The terminal will serve a methanol manufacturing facility. The plaintiffs asserted, among other claims, that the Corps’ “truncated” National Environmental Policy Act review failed to fully consider the project’s greenhouse gas impacts.
Complaint
Greenhouse gasFossil fuelGasChemical impact+ 21 more

Summary

Challenge to U.S. Corps of Engineers issuance of a Section 404 permit for a maritime export terminal associated with a proposed methanol facility in Washington on the Columbia River.

 Topics mentioned most in this case

See how often Topics get mentioned in this case and view specific passages of text highlighted in each document.

Group
Topics
Policy instrument
Risk
Just transition
Renewable energy
Fossil fuel
Greenhouse gas
Economic sector
Finance